A Crane has arrived!!

Anybody have any idea if they will install the video board prior to lifting the cross piece or after its in the air?
 
One use for the scaffolding could be be to attach those fancy angled pieces below the crossbeam (shown in the scoreboard renderings)
 
One use for the scaffolding could be be to attach those fancy angled pieces below the crossbeam (shown in the scoreboard renderings)

Those angled pieces you talk of aren't wood toothpicks and more than likely won't be hand cranked into place. They will more than likely be heavy and lifted into place via crane and what the scaffolding does is provide the iron workers with a level working platform for ladders and possibly a rolling scaffold to ease erection. Also what the scaffold does is protect a portion of the jakes glass roof section that could be very dangerous if a bolt/wrench falls out of hand and goes through the glass and injures someone inside.

I would think after the main truss is put into place they will set up the crane where the truss system currently sits which provides them with possibly an adequate angle to tree bottom and top angled steel members.

Again, I have no idea just speculating on what I see from the video and what is given to the contractor as far as site utilization plan goes
 
Those angled pieces you talk of aren't wood toothpicks and more than likely won't be hand cranked into place. They will more than likely be heavy and lifted into place via crane and what the scaffolding does is provide the iron workers with a level working platform for ladders and possibly a rolling scaffold to ease erection. Also what the scaffold does is protect a portion of the jakes glass roof section that could be very dangerous if a bolt/wrench falls out of hand and goes through the glass and injures someone inside.

I would think after the main truss is put into place they will set up the crane where the truss system currently sits which provides them with possibly an adequate angle to tree bottom and top angled steel members.

Again, I have no idea just speculating on what I see from the video and what is given to the contractor as far as site utilization plan goes

My inner child snickered at this part.
 
That's basically what I meant, is a place to work from. Also, since I posted I see where they covered over the glass so that makes sense of protecting the glass.
 
Those angled pieces you talk of aren't wood toothpicks and more than likely won't be hand cranked into place. They will more than likely be heavy and lifted into place via crane and what the scaffolding does is provide the iron workers with a level working platform for ladders and possibly a rolling scaffold to ease erection. Also what the scaffold does is protect a portion of the jakes glass roof section that could be very dangerous if a bolt/wrench falls out of hand and goes through the glass and injures someone inside.

I would think after the main truss is put into place they will set up the crane where the truss system currently sits which provides them with possibly an adequate angle to tree bottom and top angled steel members.

Again, I have no idea just speculating on what I see from the video and what is given to the contractor as far as site utilization plan goes

I would hope the day they put up the center section noone is allowed to be in the Jake.
 
The scaffolding is in place to protect the skylight on the roof of the Jake. The siding on the north side of the truss is being installed prior to erection. The videoboard itself and all related equipment will be installed after the truss is in place above the Jake. The pieces of steel that sit on top of the truss and hang below it that slope to match the roof of the Jake will be placed after the truss is erected.

Any more questions?
 
The scaffolding is in place to protect the skylight on the roof of the Jake. The siding on the north side of the truss is being installed prior to erection. The videoboard itself and all related equipment will be installed after the truss is in place above the Jake. The pieces of steel that sit on top of the truss and hang below it that slope to match the roof of the Jake will be placed after the truss is erected.

Any more questions?

Hangover-movie-11.jpg


Is it Awesome?
 
The scaffolding is in place to protect the skylight on the roof of the Jake. The siding on the north side of the truss is being installed prior to erection. The videoboard itself and all related equipment will be installed after the truss is in place above the Jake. The pieces of steel that sit on top of the truss and hang below it that slope to match the roof of the Jake will be placed after the truss is erected.

Any more questions?

Where do babies come from?
 
The scaffolding is in place to protect the skylight on the roof of the Jake. The siding on the north side of the truss is being installed prior to erection. The videoboard itself and all related equipment will be installed after the truss is in place above the Jake. The pieces of steel that sit on top of the truss and hang below it that slope to match the roof of the Jake will be placed after the truss is erected.

Any more questions?

The question everyone keeps asking is how much does the top truss weigh and what is the erection plan entail (# cranes, size of cranes, location etc.)
 
Is it just me or has nothing happened for a few days?

A lot of activities have been happening, it's just not as visible as steel erection. They've been bolting up all the connections, painting connections and any damaged steel, installing the north wall and it's framing (hard to see because it's on the other side of the structure), installing the misc. metals, etc. Lots of work, not a lot of visible progress.
 