JTS construction webcam?

Why so blue about that SE corner, guys?
attachment.php
 

Attachments

  • JTS 7-21 Blue.jpg
    JTS 7-21 Blue.jpg
    96.1 KB · Views: 578
There are a lot of workers down at the base. I hope there isn't a serious issue.

Where they're all standing at field level is the new pumping station. Where they're removing bleachers is the water's path out. NBD, no rain in the forecast until Friday.
 
Probably all out there watching TV on that giant new screen they installed...:smile:
 
Hope its that simple and not a flaw in the pumping system that requires it to be rebuilt.

Yeah, I was saying NBD kinda tongue in cheek...but I think there are 3 pumps in there, so I don't imagine it would be critical.

Did you not see my SEZ Crane Inception post? Come on, that was gold.
 
The pumping station has already been rebuilt lowering the pump house to allow for seating. There is plenty of room for the crane to exit as well. It is all on schedule for September 5. No reason to worry. Wish they would fire up the other chiller so the air upstairs worked better.
 
Looks to me like they forgot to add support from the existing structure into the new stands, there was a hell of a gap that they uncovered and they appear to be adding beams now into that gap. Whoops.
 
The pumping station has already been rebuilt lowering the pump house to allow for seating. There is plenty of room for the crane to exit as well. It is all on schedule for September 5. No reason to worry. Wish they would fire up the other chiller so the air upstairs worked better.

So she's still in there!
 
Are they adding more structural steel to that spot where they ripped up the bleachers? Or am I just seeing things?
 