JTS construction webcam?

The true "Iowa State" way to get to 30-12 would probably be:

TD (6-0)
PAT blocked, run back for 2 (6-2)
FG (9-2)
TD + 2pt conv (9-10) [pitchforks and torches appear in the stands]
TD (16-10)
TD (23-10)
TD (30-10)
Bad snap sails over punter's head for a safety (30-12)

I think people at work are wondering why I'm LOL'ing
 
And in related news, there are a bunch of Manatts road construction-type vehicles in the C-6 lot. Could they possibly be resurfacing the "gravel" tailgate lots?
 
I know the warning track was being paved. Did it seem like more vehicles than something minor like that?


It was about 6 or 8 vehicles. One paver. One small bucket loader. Several dump trucks. But nobody around any of the vehicles. And nobody doing stuff that looked like getting the parking lot ready, such as putting up cords to keep lots clear, so maybe it was for a project inside the stadium.
 
attachment.php
 

Attachments

  • jts 7-2 midday.jpg
    jts 7-2 midday.jpg
    88.4 KB · Views: 1,951
Uuuugh! This is driving me nuts! I just want them to finish of the rest of the base so it's completely enclosed. That old water pump section is taking forever. I'm assuming they need custom fabricate some of those shorter supports now that the old pump structure has been removed. It's going to be great to see it finally all closed in. Can't wait!
 
Uuuugh! This is driving me nuts! I just want them to finish of the rest of the base so it's completely enclosed. That old water pump section is taking forever. I'm assuming they need custom fabricate some of those shorter supports now that the old pump structure has been removed. It's going to be great to see it finally all closed in. Can't wait!

My sense is that they are way ahead of schedule on the seating areas (or at least have plenty of time to get it done), so they aren't rushing to do anything. Lately, they have been focused mostly on the new seats.

I saw that they have also done some work on new signage on the concourses for the seating sections. Didn't see any old signage being disposed so I wonder if they are just repainting the old ones.
 
It was about 6 or 8 vehicles. One paver. One small bucket loader. Several dump trucks. But nobody around any of the vehicles. And nobody doing stuff that looked like getting the parking lot ready, such as putting up cords to keep lots clear, so maybe it was for a project inside the stadium.


Not sure they worked on (lots of projects on campus), but the equipment is gone and nothing was done with the tailgating lots. Oh well.
 
My sense is that they are way ahead of schedule on the seating areas (or at least have plenty of time to get it done), so they aren't rushing to do anything. Lately, they have been focused mostly on the new seats.

I saw that they have also done some work on new signage on the concourses for the seating sections. Didn't see any old signage being disposed so I wonder if they are just repainting the old ones.

Yeah, I'm not really complaining that they're slow. I guess I'm just impatient to see it all enclosed completely. It's going to be fun to see it completed.
 
It's perfectly obvious that the reason why they haven't filled the old pump station is because the crane is still underneath there. Nobody has physically seen it leave the stadium yet.
 
Its too bad that the endzone club seats do not create the logo on them when they are empty. That would be kind of cool. And I know it wouldn't bee seen on game day but it is one of those little things that would make the appearance kind of cool.
 

Help Support Us

Become a patron