Very nice. I wonder what type of device that photo was taken on considering there isn't anything tall located south of the stadium.
They probably just took a snorkel lift up to get that shot.
Follow along with the video below to see how to install our site as a web app on your home screen.
Note: This feature may not be available in some browsers.
Very nice. I wonder what type of device that photo was taken on considering there isn't anything tall located south of the stadium.
There are ramps being built for access to both the east and west sides. I doubt they would build those if there was no access from the plaza.Cool photo, thanks for posting.
Question: Will the general public no longer be able to use that south entry into the stadium? I know things are still coming together, but it almost looks like that entrance will only be for SEZ club seats.
Cool photo, thanks for posting.
Question: Will the general public no longer be able to use that south entry into the stadium? I know things are still coming together, but it almost looks like that entrance will only be for SEZ club seats.
Cool photo, thanks for posting.
Question: Will the general public no longer be able to use that south entry into the stadium? I know things are still coming together, but it almost looks like that entrance will only be for SEZ club seats.
Word is from multiple trades that the project is far behind.
It was a 14 month (July '14 - August '15) project that is 85% done...
http://www.fpm.iastate.edu/planning/projects/
Baker has been pulling people from everywhere to finish. Heard many of the finishes haven't started. 30 days out. Might just be banter, but normally the tradesmen know.
Word is from multiple trades that the project is far behind.
If divided evenly over the entirety of the project, 15% of the project remaining would take 2.1 months. We are 53 days from kickoff. So my non-connected opinion is they are about a week to ten days behind schedule. Not particularly surprising given the short window for the project and not impossible to make up in a roughly 50 day period.
Paraphrasing, AD Pollard said at Cyclone Tailgating Tour stop, finishing the 7,000 square foot kitchen was a concern. Getting it completed, staff hired and trained before the first game a priority.
Getting the equipment in a timely fashion, getting it placed, wired, and plumb'd even with the rough-ins correct can be a challenge.
*Rep gun armed*I just got word that the athletics logo is up on the glass on the outside. I'll try to drive by and get a photo on my way home today.
I just got word that the athletics logo is up on the glass on the outside. I'll try to drive by and get a photo on my way home today.