JTS construction webcam?

The bandwith they allocated this poor webcam is pitiful. Am I the only one not able to connect to it 60% of the time?
 
Looks like they're putting in the lower section footings right now.
 
Am I the only person (non engineer) who looks at the webcam, and wonders what the heck they're doing now?


I stopped by today. Most of the guys I saw working were up in the SE upper deck. Looked like they were installing the mounts for the bleachers.

Also, there was a steady flow of smoke coming from the hole behind the endzone (the hot tub hole). Not sure why?
 
Also, I didn't see any more of the preformed concrete pieces to put on the iron in the SW upper deck. Perhaps they are waiting for something else to get done first. Or maybe the preformed concrete just hasn't been delivered yet.
 
Also, I didn't see any more of the preformed concrete pieces to put on the iron in the SW upper deck. Perhaps they are waiting for something else to get done first. Or maybe the preformed concrete just hasn't been delivered yet.

Theyve been putting on the preformed concrete walls of the stairs into the upper deck. I imagine when those get done then the big seating section pieces come.
 