Need some CF expertise.
There's a room in my basement that was previously finished that I'm refinishing (adding insulation & proper framing/drywall, etc). It was previously just foam insulation with wood paneling glued on top. The electrical is currently run through conduit & attached directly to the poured foundation.
Question: When I adhere the new EPS insulation to the foundation, can I just I work around the existing conduit, or will I need to have that conduit re-run so it sits on the inside of the EPS?
There's a room in my basement that was previously finished that I'm refinishing (adding insulation & proper framing/drywall, etc). It was previously just foam insulation with wood paneling glued on top. The electrical is currently run through conduit & attached directly to the poured foundation.
Question: When I adhere the new EPS insulation to the foundation, can I just I work around the existing conduit, or will I need to have that conduit re-run so it sits on the inside of the EPS?